Next: Summary  Previous: List of Tables


LIST OF FIGURES

Figure 1 - Average 1995 retail electric rates.
Figure 2 - Heat Rate as a function of Gas Turbine Size.
Figure 3 - Cost per kW for Gas Turbines as a Function of kW Rating.
Figure 4 - Energy Balance for Naturally Aspirated Reciprocating Engine. (orange book)
Figure 5 - Relative Hourly Cost of Operation for 5 Systems.
Figure 6 - Total Monthly Electrical and Gas Usage for Georgia Tech Campus for 1995 year.
Figure 7 - Frequency Plot of Hourly Power Consumption for Georgia Tech Campus.
Figure 8 - Georgia Tech Campus Monthly Load Factors for 1995.
Figure 9 - Degree Days and Total Daily Gas Usage for 1995.
Figure 10 - Regression Plot for Gas Usage as a Function of Degree Days.
Figure 11 - Simple Payback for the Base Loading Operational Strategy.
Figure 12 - Simple Payback for the Peaking Operational Strategy.
Figure 13 - Simple Payback for the Thermal Following Operational Strategy.