
3.1 Chiller Manufacturer Data
4.1 Cooling Tower Data
4.2 Pressure Drop Across Condenser for Different Chillers
5.1 Design Characteristics
5.2 Energy Consumption for a 1000 Ton Electric Chiller
5.3 Energy Costs for a 1000 Ton Electric Chiller
5.4 Energy Consumption for a 1000 Ton Single Stage Absorption Chiller
5.5 Energy Costs for a 1000 Ton Single Stage Absorption Chiller
5.6 Energy Consumption for a 1000 Ton Double Stage Absorption Chiller
5.7 Energy Costs for a 1000 Ton Double Stage Absorption Chiller
5.8 Energy Consumption for a 1000 Ton Gas Engine Driven Chiller
5.9 Energy Costs for a 1000 ton Gas Engine Driven Chiller
5.10 Energy Consumption for 500 Ton Electric Chiller (Lead) with 500 Ton Single Stage Absorption Chiller (Lag)
5.11 Energy Costs for 500 Ton Electric Chiller (Lead) with 500 Ton Single Stage Absorption Chiller (Lag)
5.12 Equipment Costs for Hybrid System of a 500 Ton Electric Chiller and 500 Ton Single Stage Absorption Chiller
5.13 Energy Consumption for 500 Ton Electric Chiller (Lead) with 500 Ton Double Stage Absorption Chiller (Lag)
5.14 Energy Costs for 500 Ton Electric Chiller (Lead) with 500 Ton Double Stage Absorption Chiller (Lag)
5.15 Equipment Costs for Hybrid System of 500 Ton Electric Chiller and 500 Ton Double Stage Absorption Chiller
5.16 Energy Consumption for 500 Ton Electric Chiller (Lead) with 500 Ton Gas Engine Driven Chiller
5.17 Energy Costs for 500 Ton Electric Chiller (Lead) with 500 Ton Gas Engine Driven Chiller (Lag)
5.18 Equipment Costs for Hybrid System of a 500 Ton Electric Chiller and a 500 Ton Gas Engine Driven Chiller
5.19 Energy Consumption for 500 Ton Electric Chiller (Lead) with 500 Ton Electric Chiller (Lag)
5.20 Energy Costs for 500 Ton Electric Chiller (Lead) with 500 Ton Electric Chiller (Lag)
5.21 Energy Consumption for 500 Ton Gas Engine Driven Chiller (Lead) with 500 Ton Gas Engine Driven Chiller (Lag)
5.22 Energy Costs for 500 Ton Gas Engine Driven Chiller (Lead) with 500 Ton Gas Engine Driven Chiller (Lag)
5.23 Energy Consumption for 500 Ton Gas Engine Driven Chiller (Lead) with 500 Ton Electric Chiller (Lag)
5.24 Energy Costs for 500 Ton Gas Engine Driven Chiller (Lead) with 500 Ton Electric Chiller (Lag)
5.25 Equipment Costs for Hybrid System of 500 Ton Gas Engine Driven Chiller and 500 Ton Electric Chiller
6.1 Equipment and Energy Costs
6.2 Annual Operating Costs for 1000 Ton Chiller Systems